Cadeler lands turbine installation contract
- Admin
- Jul 15, 2024
- 1 min read
Cadeler has signed a preferred supplier agreement with an undisclosed client to transport and install offshore turbines. The work is scheduled to begin in 2029 and is contingent upon the client's success in a future auction. Cadeler also recently signed a contract with Inch Cape Offshore Limited for the installation of 72 Vestas 15MW turbines at the Inch Cape Offshore wind farm.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








