top of page

Polish firm wins Baltica 1 design job

  • Admin
  • Aug 5, 2024
  • 1 min read

PGE Baltica signed an agreement with Energoprojekt-Katowice for the 900MW Baltica 1 Offshore Wind Farm. The project includes electrical analyses, cost and reliability assessments, and preparatory studies. The PGE Group plans construction of Baltica Offshore Wind Farm by 2030 in two stages, with a total capacity of 2.5GW. The Baltica 1 project is located in Pomeranian Voivodeship, approximately 80km from the coastline.


Source:

Want to read more?

Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.

Top Stories

Turning media into business growth opportunities.

Sign up for our weekly newsletter.

Thanks for subscribing!

© 2024, Ib Centre Inc.

bottom of page