WindEurope takes aim at grid bottlenecks
- Admin
- Jul 7, 2024
- 1 min read
The article discusses the challenges in grid access for wind energy projects in Europe. It highlights the administrative overload and delays in wind energy expansion due to grid connection permits. The EU aims to increase wind energy capacity significantly by 2030 and 2050. WindEurope proposes actions to release grid capacity. It emphasizes grid access as the primary bottleneck and the need for immediate measures to accelerate grid expansion.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








