Botswana launches tender for feasibility study on floating solar at dams
- Admin
- Sep 11, 2024
- 2 min read
WUC, Botswana’s state-owned water and wastewater utility, has opened a tender for a feasibility study on deploying floating solar plants at its dams. Bidders can obtain the full tender details on WUC’s website for BWP 1,100 ($82.18). The tender is open to international bidders. According to figures from the International Renewable Energy Agency (IRENA), Botswana had 6 MW of installed solar at the end of 2023. In August, state-owned Botswana Power Corp. signed a power purchase agreement for the development of a 100 MW solar plant in the southern part of the country.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.







