Cadeler bags Inch Cape installation gig
- Admin
- Jun 24, 2024
- 1 min read
Cadeler has announced a contract with Inch Cape Offshore Limited for the installation of 72 Vestas 15MW turbines at 1100MW Inch Cape Offshore wind farm in Scotland. The project is a joint venture by Red Rock Power and ESB, aimed to generate energy for 1.6 million UK households. Cadeler will use their M-class installation vessels for the project with an estimated duration of 249 days.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








