NKT completes cable repairs at Gemini Wind Park
- Admin
- Sep 23, 2024
- 2 min read
NKT has completed repairs to the 600MW Gemini Wind Park off the Dutch coast. The wind farm experienced a cable failure and a repair team led by NKT replaced the cable between the wind park, majority-owned by Northland Power, and the Groningen coast. Axel Barnekow Widmark from NKT mentioned the successful repair and collaboration with the Gemini team in restoring the subsea connection, bringing the wind park back to full operational capacity.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








