Nordex Group bags German repowering order
- Admin
- Jun 20, 2024
- 1 min read
Nordex secures a 75MW repowering project in Lower Saxony involving the supply of 11 N163/6.X turbines to Badbergen-Dinklage wind farm. The repowering replaces 17 Sudwind S70 turbines with 6.8MW Nordex turbines. The project is a significant contribution to the energy transition.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








