ORIT prepares to power up UK PV site
- Admin
- Jun 12, 2024
- 1 min read
The Board of Octopus Renewables Infrastructure Trust (ORIT) has announced that the 67MW Breach solar farm in Cambridgeshire, UK, is now undergoing the final stages of its commissioning process. It has started exporting some electricity to the grid and expects to reach full export generation capacity this month. The asset has a 10-year PPA with Iceland Foods Limited, which will offtake 100% of the production from the site at a fixed price linked to UK inflation (CPI).
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








