Prysmian completes EolMed export cable
- Admin
- May 30, 2024
- 1 min read
Prysmian has completed the export cable installation for the 30MW Gruissan/EolMed floating offshore wind farm project in France. The project involved the design, supply, installation, termination, testing, and commissioning of a submarine power cable system connecting the onshore grid to the floating electrical hub of the wind farm.
Source:
Want to read more?
Subscribe to vitaliydaviy.wixsite.com to keep reading this exclusive post.








